This chapter briefly introduces the mechanical installation of the UPS, cable connection and commissioning of the
single UPS.
Each site has its peculiarity, so this chapter provides the guidance with general installation procedures and methods for
the installation engineer who should conduct the installation according to the actual conditions .
1. The UPS should be installed by a qualified engineer according to the information contained in this
chapter. If any problem is found, please get in touch with Vertiv local service center immediately.
2. The UPS shall not be powered on without approval of the commissioning engineer.
3. For other equipment which is not introduced in this manual, the detailed information about
mechanical installation and electrical installation are delivered with the equipment.

Unpacking and Inspection

2.1
The UPS adopts the carton box. Open carton box as shown in the figure 2-1. Visually inspect the UPS appearance for
transportation damage. If any problem is found, please notify the carrier immediately. Check the accessories and
models against the delivery list. If any problem is found, please notify the dealer immediately.
Vertiv|Liebert® S600 10kVA ~ 20kVA UPS | User Manual

Chapter 2 Installation and Commissioning

Figure 2-1
Unpacking the UPS
19

Advertisement

Table of Contents
loading

Table of Contents