Replacement Of The Inclined Base (S; Replacement Of The P5 Post - Panasonic AG-MD830E Service Manual

Table of Contents

Advertisement

i:l!!
en
z
«
:c
u
w
:l!!
3-5-7. REPLACEMENT OF THE
INCLINED BASE (S),(T)
Supply Side
1.
Unscrew a screw (I) and remove the head
cleaning plate unit as shown in Figure M16-A.
2.
Unscrew the 2 screws
(J)
and remove the post
stopper.
CUT WASHER
DD CYLINDER
HEAD CLEANING
PLATE UNIT
Figure M16-A
3.
Remove the P2 post unit from loading arm (5) as
shown in Figure M 16-B.
SECTOR GEAR
P2 POST UNIT
o
LOADING GEAR (T)
LOADING GEAR
(s)
Figure M16-B
4.
Pull out the Inclined base (5) from loading base.
5.
The new inclined base unit can be reinstalled by
reversing the removal procedure.
Note:
Install post stopper pusing the arrow direction
(A),(B) as shown in Figure M16-A.
After re-installing the inclined base (5)
confirmation of tape interchangeability and
P2, P3 posts adjustments are required.
Take-up Side
1.
Unscrew a screw (K) and remove the inclined
base (T) as show in Figure M14.
Figure M16-C
2.
Install the inclined base (T) so that the tip of
inclined base is center on the Plate Hole and then
tighten screw (K).
Note:
After re-installing the inclined base
(T)
confirmation of tape interchangeability and
inclined base adjustment are required.
3-5-8. REPLACEMENT OF THE P5
POST
1.
Remove the top cover and cassette holder.
2.
Rotate the loading motor to clockwise, until the
stop mode.
3.
Remove the pressure roller unit.
4.
Remove the pinch cam (Ref. to Replacement of
the mode switch) and PS pull out sector gear as
shown in Figure M17.
PRESSURE ROLLER
Figure M17
5.
Unscrew a Nut (A) and Remove the PS Post.
6.
The new PS post can be reinstalled by reversing
the removal procedure.
Note:
After-reinstalling the PS post confirmation of
tape waving and PS post height adjustment
are required.
3-12

Advertisement

Chapters

Table of Contents
loading

Table of Contents