Cable End Processing Method - JRC JMA-9133-SA Installation Manual

Marine radar equipment
Hide thumbs Also See for JMA-9133-SA:
Table of Contents

Advertisement

JMA-9100/7100 Installation Manual > 2.INSTALLATION OF SCANNER UNIT > 2.1 EQUIPMENT CABLE
2.1.4

Cable end processing method

Allow for sufficient cable length so that maintenance, inspection, and repair work
can be easily executed. Ensure a place to store the cable.
1)
CFQ-6912
 Cut off the metal shell connector.
Remove about one meter of the outer skin, and then process the double braided
shield according to the procedures shown below.
Width for
clamping cable
abt.
Fig 2-4:
CFQ-6912 Cutting position
Outer Shield
Outer Shield
CFQ-6912
30 mm
Fig 2-5:
CFQ-6912 Processing of braided shield
2- 4
abt. 80 mm
taping
abt.
1000 mm
Terminal

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents