Installation Of Sub-Operation Unit And Expansion Of Trackball; Sub Operation Unit - JRC JMA-9133-SA Installation Manual

Marine radar equipment
Hide thumbs Also See for JMA-9133-SA:
Table of Contents

Advertisement

JMA-9100/7100 Installation Manual > 5.OPTION UNIT > 5.4 INSTALLATION OF SUB-OPERATION UNIT AND EXPANSION OF
TRACKBALL
5.4
INSTALLATION OF SUB-OPERATION
UNIT AND EXPANSION OF
TRACKBALL
5.4.1

Sub Operation Unit

With regard to JMA-7100 and JMA-9100 series radars, an operation unit can be
expanded as an option.
Connect the cable to J4312 of terminal board circuit CQD-2097 located in the
display unit (processing unit).
MODEL: NCE-5163 (5-meter long cable)
Fig 5-64:
Sub-operation unit connection connector
5- 64
J4312 SUB
J4311 MAIN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents