Control technology for 75 MW
Wind Farm in Sweden
Cross-cultural project
partnership
DEIF Wind Power Technology
has taken part in the project
of commissioning 30 new GL
certified turbines with a total
capacity of 75MW for one of
Europe's largest wind farms
Blaiken Wind in Sweden.
Together the partners Dongfang,
the utility Skelleftåe Kraft and
DEIF Wind Power Technology
have efficiently commissioned
30 turbines within a year. The
complete electrical system is
delivered and integrated by
DEIF Wind Power Technology
and Dongfang has delivered the
turbines, which have been GL
certified in China, based on a
collaboration between DEIF and
TÜV SÜD certifying body. With
the technological know-how,
DEIF on-site team of engineers
have integrated the pitch and
turbine control system including
a de-icing system for sustaining
full functionality in very cold
temperatures.
Complete system integration
& technological know-how
DEIF Wind Power Technology
constitutes a strong competence
in securing the turbine
components for the complete
system in Dongfang's turbines
for the wind park. The entire
system is built on integration of
DEIF Wind Power Technology's:
Turbine and Pitch Control,
Park Control and SCADA for
successful. An important part
10
of the integrated technology is
the Wind Park Control System,
which secures a stable and
reliable power production to be
transferred to the grid after the
commissioning of the turbines.
In order to secure this, the Wind
Park Control System has been
built to comply with the Swedish
criteria and local grid code
demands for energy production
and integration to the electrical
grid. The entire purpose is
to secure a safe and reliable
production of clean energy for
thousands of households in
Northern Sweden.