Alcatel Drytel 100 Instruction Manual page 3

Pumping unit
Table of Contents

Advertisement

READ THIS MANUAL COMPLETELY BEFORE UNPACKING AND INSTAWNG THE UNIT
Check the crates for damage in shipping. Notify ALCATEL and shipping company of any damage.
DO NOT UNPACK UNIT UNTIL READY TO INSTALL
The guaranty is in effect only if the instructions in this manual are followed.
When returning equipment to our factories for repair or maintenance by our After-Sales Service, we would
request you to
. let us know in writing, if your pump has been used for applications involving toxic or dangerous products,
such chlorine, fluorine and their derivatives, etc ... Please specify the nature of the product used, if this is the
�� :ase.
If high risk or contaminating products, such as arsenic and its compounds, cyanide, etc ... have been used,
we are only able to carry out work on your equipement after decontamination performed and certified by
your company, or by a specialist.
We advise the user that:
- The pumping unit must
- For the initial start up, or when the pump is not used for a 2 months period, the MDP should
for approximately 5 minutes at atmospheric pressure ( see section 3.4 ) .
- It is necessary to lubricate periodically the ball-bearings ( see cha pte r 5.2.2 ) .
NOTES
RETURN FOR REPAIR OR MAINTENANCE WORK
be
handled by means of the four lifting rings on the housin g.
27
be
operated

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents