Chapter 4 Product Installation
Figure 4-1 Packing of ZXSDR R8882 L268
4.2.3 Unpacking and Checking Flow
Figure 4-2
shows the flow of unpacking and checking. Refer to Unpacking and Checking
Manual in the ZXSDR R8882 L268 engineering materials for detailed steps and
precautions.
4-7
SJ-20110104194923-001|2011-01-19(R1.0)
ZTE Proprietary and Confidential