Installation And Set-Up - Vents VUE 250 V mini A12 User Manual

Heat recovery air handling unit
Table of Contents

Advertisement

While installing the unit, provide enough access for maintenance or repair work.
When selecting an installation location of the unit, provide free opening of the service panel.
To get the best performance of the unit and to minimize turbulence-induced air pressure losses, connect the straight air duct section to the spigots on
both sides of the unit while installing.
Minimum straight air duct length:
equal to 1 air duct diameter on intake side
equal to 3 air duct diameters on outlet side
If the air ducts are too short or not connected, protect the unit parts from ingress of foreign objects.
To prevent uncontrollable access to the fans, the spigots may be covered with a protecting grille or other protecting device with mesh width not more
than 12.5 mm.
The unit must be mounted on a plane wall.
Installing the unit to an uneven surface could lead to the unit's casing distortion and operation disturbance.
The unit is designed for mounting on a horizontal plane as well as for wall mounting with a fixing bracket that is fastened with three screws and
dowels (not included in the delivery set).
1. When selecting the installation site, provide minimum allowed distances to the unit.
VUT/VUE 250 V mini A12/A1
150 mm
VUT/VUE 250 H mini A12/A1
150 mm
www.ventilation-system.com
READ THE USER'S MANUAL BEFORE INSTALLING THE UNIT.
THE UNIT MUST BE MOUNTED BY A QUALIFIED EXPERT ONLY, PROPERLY TRAINED AND
HAVING THE REQUIRED TOOLS AND MATERIALS.
UNIT WALL MOUNTING
150 mm
150 mm
150 mm

INSTALLATION AND SET-UP

500 mm
500 mm
7