IMPORTANT – BEFORE GETTING STARTED
•
Make sure the temperature of the environment
surrounding the machine is in between the 40°F –
104°F (5°C – 40°C).
•
In the case of lightning, make sure to turn-off the
embroidery machine
•
Set up the embroidery machine near an electrical outlet.
•
Keep the machine free of dust.
•
Do not keep liquid near the embroidery machine.
•
Make sure all packaging materials have been removed.
•
Make sure all base feet are at the same height.
•
Make sure all base feet are locked.
•
Exercise caution when removing parts.
•
Do not plug the embroidery machine into the socket
until the machine is set-up and ready to begin.
•
Wear glasses and gloves when lubricating the
embroidery machine.
•
Do not block the ventilation of the embroidery
QUICK REFERENCE GUIDE/CHECKLIST
Before embroidery machine operation, please confirm the following steps have been performed.
Step
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Operation
Important: Before getting started
Threading of top thread
Check thread tension
Bobbin in the rotary hook
Turning on the machine
Importing a design
Select embroidery design
Select embroidery hoop
Hoop fabric
Attach embroidery hoop onto the embroidery machine
Check embroidery area
Start embroidery
Remove embroidery hoop and fabric
Turning off
machine.
•
Make sure the embroidery machine is not in direct
sunlight.
•
Set the embroidery machine two inches (2") away from
the wall.
•
Lift the embroidery machine with at least two people.
•
Lift the embroidery machine from he bottom – ONLY.
•
Make sure there are no objects underneath the
embroidery machine
•
Make sure there are no objects within the moving range
of the embroidery machine.
•
Set the embroidery machine on a leveled, balanced and
durable surface.
Reference page
7
18
26
16-17
13
33
34
34
23
22
36
42
22
13
INTRODUCTION – 7