Appendix G: Ce Grounding Compliance - HindlePower AT30 SERIES Operating And Service Instructions

Microprocessor-controlled three phase input float battery charger
Table of Contents

Advertisement

APPENDIX G
CE COMPLIANCE - PROPER GROUNDING
• It is the responsibility of the installer of the AT30 to supply suitable
grounding and approved ground wire.
• The AT30 chassis must be grounded in accordance with the national
electrical codes of the country where installed.
• The ground wire must be approved for use in the country in which the
AT30 is installed, or bear the
• A separate bi-color ground wire (green with a 30% yellow stripe) must be
run in hard-pipe conduit along with ac supply wiring.
• There must be no switches, splices, or over-current protection in the
ground wire.
• Refer to the Data Nameplate Decal affixed to the outside panel of the
AT30 to determine maximum available operating current.