Operation; Power On/Off; Operation And Display Panel - MPP Solar 2424LV-HS User Manual

Pip 3kva/24v solar inverter charger 110/120v output
Table of Contents

Advertisement

OPERATION

Power ON/OFF

Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch
(located on the right corner of the rear panel) to turn on the unit.

Operation and Display Panel

The operation and display panel, as shown in the chart below, are on the front panel of the inverter. It
includes three indicators, four function keys and an LCD display, indicating the operating status and
input/output power information.
LED Indicator
LED Indicator
Function Keys
Function Key
ESC
UP
DOWN
ENTER
Solid On
Green
Flashing
Solid On
Green
Flashing
Solid On
Red
Flashing
Description
To exit setting mode
To go to previous selection
To go to next selection
To confirm the selection in setting mode or enter setting mode
Messages
Output is powered by utility in Line mode.
Output is powered by battery or PV in battery mode.
Battery is fully charged.
Battery is charging.
Fault occurs in the inverter.
Warning occurs in the inverter.
10
LCD display
LED indicators
Function keys

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2424lvmsdLv series

Table of Contents