Operation; Power On/Off; Operation And Display Panel - MPP Solar LV5048 User Manual

3kw/5kw inverter / charger
Table of Contents

Advertisement

OPERATION

Power ON/OFF

Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch
(located on the button of the case) to turn on the unit.

Operation and Display Panel

The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes
three indicators, four function keys and a LCD display, indicating the operating status and input/output
power information.
Setting LED 1
Function keys
Setting LED 3
LED Indicators
LED Indicator
Setting LED1
Setting LED2
Setting LED3
Status
Indicator
LCD display
Setting LED 2
Green
Solid On
Green
Solid On
Green
Solid On
Solid On
Green
Flashing
Solid On
Green
Flashing
Solid On
Red
Flashing
11
Messages
Output powered by utility
Output powered by PV
Output powered by battery
Output is available in bypass mode
Output is powered by battery or AC in inverter mode
Battery is fully charged
Battery is charging.
Fault mode
Warning mode
Status
indicators
Function keys
On/off switch

Advertisement

Table of Contents
loading

Table of Contents