Moving Your Instrument; Starting The System; Pre-Analysis Checklist - Agilent Technologies 240 Series AA User Manual

Including zeeman
Table of Contents

Advertisement

Moving your instrument

Heavy Weight
WARNING
The instrument weighs over 50 kg (110 lb). Do not attempt to lift the
instrument alone. Always use two or more people when lifting or carrying
the instrument into position.

Starting the system

The instrument power switch is a rocker type, located on the front of the
instrument on the left-hand side. Switch the power switch to 'I' to start the system.
The green indicator light will come on.
For instructions on how to start any accessories, refer to the manuals supplied
with the accessories.
If you have not already done so, start the SpectrAA software as described on Page
47.

Pre-analysis checklist

The general preparation procedure is as follows:
1
Install all the required hardware, including any associated accessories such as
SIPS, according to the instructions in the Help (see Page 51) and any
accessory manuals.
2
Turn on the instrument and any peripheral accessories as described in the
previous section.
3
Hold a thin single-ply tissue up to the mouth of the extraction hood to ensure
that the exhaust system is working. The tissue should be drawn towards the
hood.
4
Check the gas supplies to make sure that you have enough gas to complete
your analysis. Also, check that the acetylene cylinder pressure is above 700
kPa (about 100 psi) to ensure that acetone is not drawn into the instrument.
Agilent 240/280 Series AA (including Zeeman)
Getting Started
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

280 series aa

Table of Contents