Step 2:
Step 3:
Step 4:
Occupancy Sensor Installation Guide
Step 1:
terminate
wires here
If you are installing the sensor in series with other sensors
or stations (continuing the data run), use the provided
LinkConnect pigtail, ESD ground pigtail and WAGO connectors
to make the terminations. If you are not continuing the data
run, proceed to step 3.
a: Strip 3/16" (5mm) of insulation from each installed LON
wire.
b: Open the three terminal levers on a WAGO connector
and insert the installed (typically black) Belden 8471
LinkConnect wire, the black lead from the sensor pigtail,
and the continuing Belden 8471 (typically black) wire into
the terminals.
c: Close the levers onto the wires.
d: Repeat the above for the installed (typically white) Belden
8471 LinkConnect wire and the remaining pigtail from
the sensor, and repeat for the ESD ground wires. Use a
new WAGO connector for each termination type.
Orient the smooth side of the mounting plate to the junction
box and pull the Belden 8471 and the 14 AWG (2.5mm
ground wire from the junction box through the provided holes
near the center of the mounting plate.
Secure the mounting place to the junction box using the screws
provided (both short and long screws are included for
convenience).
Page 3 of 8
Pull the Belden 8471 (or equivalent)
and 14 AWG (2.5mm
to the junction box.
Electronic Theatre Controls, Inc.
2
) ground wire
2
) ESD

Advertisement

Table of Contents
loading

This manual is also suitable for:

P-occP-occ-hc

Table of Contents