3. Once in place, tighten small nuts, return to step 6 of Assembly.
Cable Trough and Brick Trough
1. Hang cable trough in top slot. Providing that the work surface tether bracket rules are followed,
the cable troughs will be able to be placed into second slot up on bottom rail.
2. Utilize a 3/8" screw (UZSCREWW) and weld nut (UZWNUTA) to mechanically attach the cable
trough to the bottom slot (at circle location in picture).
3. Brick troughs when supplied, can be attached where needed, though cannot used in conjunction
with cable troughs.
Need help?
Do you have a question about the Grid Frame and is the answer not in the manual?
Questions and answers