Download Print this page
Enwork AMBITION Installation Manual

Enwork AMBITION Installation Manual

24”h topper screen

Advertisement

Quick Links

A M B I T I O N
2 4 " H
T O P P E R
S C R E E N
I N S T A L L A T I O N
G U I D E
S C R E E N S
A M I 0 0 0 8
Ambition 24"H Topper Screens Installation Instructions – Rev A.

Advertisement

loading
Need help?

Need help?

Do you have a question about the AMBITION and is the answer not in the manual?

Questions and answers

Summary of Contents for Enwork AMBITION

  • Page 1 I N S T A L L A T I O N G U I D E S C R E E N S A M I 0 0 0 8 Ambition 24”H Topper Screens Installation Instructions – Rev A.
  • Page 2 I N S T A L L A T I O N G U I D E P A R T S A N D F A S T E N E R S I N C L U D E D Screen PNM-1954 Brackets 10-24 Binding Bolt Pair...
  • Page 3 I N S T A L L A T I O N G U I D E T O O L S A N D S U P P L I E S R E Q U I R E D Drill/Driver Phillips Bit Hex Bit...
  • Page 4 I N S T A L L A T I O N G U I D E A S S E M B L Y : Sandwich the screen between the brackets using the Binding Bolts. F I G U R E 1 Quarter Inch Thick Materials: Slide the gasket onto the bottom of the screen and slide the assembly into the slot on the beam top cap.
  • Page 5 I N S T A L L A T I O N G U I D E A S S E M B L Y C O N T . In cases where multiple screens are next to each other EM-1919 brackets and the 10-32 Set Screws may be included to connect the screens together at the seams.
  • Page 6 1.800.815.7251 www.enwork.com 12900 Christopher Dr. Lowell, MI 49331 Specifications subject to change without notice. Rev 08.2020...