Download Print this page

Enwork Grid Frame Installation Instructions Manual page 12

Advertisement

2. Tighten thread cutting screws (UZSCREWU) into inner holes, pushing spacer against acrylic
topper screen.
Trim Piece (UZBAND)
With every Frame you will receive a UZBAND trim tape. This tape is put on ONE side of the
frame to cover up the holes (visual improvement). It is not a structural product. Peel the back
side of the tape off and apply from one end to the other working the tape into the slot. It is best
to do this after the topper screens are installed!

Advertisement

loading
Need help?

Need help?

Do you have a question about the Grid Frame and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Grid mini frameGrid mega frame