C Transportation and commissioning

1

Transport

Depending on the overall height of the lifting mast and the local conditions transport
can be performed in two different ways:
– Standing, with lifting mast and load-carrying unit assembled
(for low overall height)
– Standing, with lifting mast and load-carrying unit disassembled
(for large overall height)
m
The assembly of the truck on site, commissioning the truck and instructing the driver
must be carried out by personnel trained and authorised by the manufacturer.
2

Transportation by crane

m
Use only hoisting equipment with appropriated carrying capacity (refer to the truck ID
plate for truck weight, see chapter B). Observe additional battery weight!
– Safe parking of the truck (refer to chapter E)
– With the mast removed, crane lifting points are at the front of the chassis where the
mast is screwed on and at the rear, where two lugs are mounted.
– With the mast installed, crane lifting points are at the top of the mast and the two
rear lugs.
m
Attach the crane hoisting equipment at the lifting points in such a way that it cannot
slip for any reason!
m
The crane hoisting gear must be attached in such a way that it cannot damage any
attached components or the overhead guard during lifting.
Transportation by crane, with mast