Service Connections - Market Forge Industries ETP-10G Installation, Operation & Maintenance Manual

Eco-tech plus gas convection steamer
Table of Contents

Advertisement

Service Connections

SERVICE CONNECTIONS
G
Gas Connection - 3/4" (19mm) Male NPT. 84,000
BTU's.
CW
Cold Water - 3/8" (10mm) NPT, Maximum 50 PSI,
Minimum 25 PSI.
D
Drain - 1-1/2" NPT male from the drain adapter (see
illustration)
EC
Electrical Connection - 120 Volts AC, 60 Hz, single
phase, comes with 6 foot cord. NEMA 5-15. Total
Amps: 2
INSTALLATION CLEARANCE
Left Side
3
GAS CONNECTION
„ 3/4" NPT male
„ 3 1/2" W.C. natural
„ 10" W.C. propane
NOTES: If the equipment is to be installed where the elevation
exceeds 2,000 ft. (609.6 meters) above sea level, specify instal-
lation altitudes so that the proper gas orifices can be provided.
Rated Input: 42,000 BTU per compartment.
All service connections are made at the rear of the unit.
NOTES: PVC and CPVC pipe are not acceptable materials for
drains.
The drain piping must consist of temperature resistant material,
greater than 160°F, and be of adequate diameter not to cause
flow restriction. Improper materials may deform and cause restric-
tions, thus affecting performance.
WATER SUPPLY
Good quality water feed is the responsibility of the owner. Water
quality must be within the following general guidelines.
TDS: 40-125 ppm
Silica: <13 ppm
Chloramine: <0.2 ppm
Hardness: 35-100 ppm
The best defense against poor water quality is a water treatment
system designed to meet your water quality conditions.
Appliance to be installed with backflow protection according to
federal, state or local codes.
INSTALLATION
Right Side
Rear
6
6
Chlorides: <25 ppm
pH: 7.0 - 8.5
Chlorine: <0.2 ppm
DIMENSIONS ARE IN INCHES [MM]
6.25 [159]
4 [102]
cw
EC
6 [152]
Figure 1
2
24 [610]
2.75 [70]
G
4 [102]
CW
EC
D
9.75
[248]
REAR FLANGED
FOOT DETAIL
2 EQUALLY SPACED
Ø7/16" [11] HOLES
ON 2.5 [63] B.C.
DRAIN ADAPTER
3.75 [95]
G
D

Advertisement

Table of Contents
loading

Table of Contents