Install The Platform - Thermo Scientific MaxQ SHKE420HP Operating And Maintenance Manual

High performance incubated orbital shaker
Table of Contents

Advertisement

Section 1
Installation

Install the Platform

1-4
Orbital Shaker
Caution Install the shaker platform before plugging in or attempting to
operate the unit.
s
The MaxQ Orbital Shaker accepts a heavy-
duty, 18" (wide) x 17-3/4" (front to back),
5/16" aluminum platform. The shaker
platform is attached to the orbital mechanism
with six 1/4-20 x 3/4" long hex socket flat head
screws, Grade 8. These screws are hardened and
should not be replaced with any other screw
type. A 5/32" hex socket wrench is included
with the shaker to attach the platform. Figure 1-8 identifies the hex socket
wrench and hex socket flat head screws.
Caution Do not attempt to use a Phillips head screwdriver!
To install the shaker platform:
1. Insert the two 1/4-20 alignment pins into the two mounting holes
identified in Figures 1-9 and 1-10.
Platform mounting stud locations
(insert alignment pins)
Figure 1-9. Mounting Holes and Pin
2. Rotate the drive mechanism until the four mounting holes
approximately match the holes in the platform.
3. Place the platform onto the shaker and over the alignment pins.
4. Move the platform in an orbital motion until one or more of the center
mounting holes are located.
Figure 1-8. Included Wrench
Platform mounting
holes on the
drive mechanism
= Platform Mounting Holes
Figure 1-10. Mounting Holes
s
Alignment Pins
Thermo Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

420 series

Table of Contents