Section Two - Installation And Configuration; Inspection; Installation; Voltage Requirements - National Instruments GPIB-MAC User Manual

Table of Contents

Advertisement

November 1985
Section Two - Installation and
Configuration
Use this section to install and configure the GPIB-MAC. Then,
read Sections Three and Four to learn about how to program the
GPIB-MAC.

Inspection

Before you install the GPIB-MAC, inspect the shipping container
and its contents for damage. If damage appears to have been
caused in shipment, file a claim with the carrier. Retain the
packaging material for possible inspection or for reshipment.
If the equipment appears to be damaged, do not attempt to operate
it. Contact National Instruments for instructions.

Installation

There are four basic steps to installing the GPIB-MAC.
1. Verify voltage requirements
2. Configure GPIB-MAC rear panel switches

3. Connect cables

4. Turn power switch to On

Voltage Requirements

The
GPIB-MAC is shipped with the internal voltage selector switch
configured to operate on a standard 115 VAC power line.
If your setup requires 230 VAC, refer to Appendix C to learn how
to open the box to change the voltage selector switch.
7
SECTION TWO: INSTALLATION AND CONFIGURATION

Advertisement

Table of Contents
loading

Table of Contents