Transport And Storage; Transport Markings; Checking The Delivery - Siemens SIMOTICS HV C Operating And Installation Instructions

Induction motor
Table of Contents

Advertisement

4.13

Transport and storage

Observe the following when carrying out any work on the machine:
● Comply with the general safety instructions (Page 13)
● Comply with the applicable national and sector-specific regulations.
● When using the machine within the European Union, comply with the specifications laid
4.13.1

Transport markings

The packing differs depending on the transport type and size. If not otherwise contractually
agreed, the packaging corresponds to the packing guidelines for International Standards for
Phytosanitary Measures (ISPM).
Note the symbols which appear on the packing. These have the following meanings:
Top
4.13.2

Checking the delivery

The components are assembled on an individual basis. When you take receipt of the delivery,
please check immediately whether the scope of the delivery matches up with the
accompanying documents. No claims relating to defects/items missing from the delivery will
be accepted if they are submitted at a later date.
● Report any apparent transport damage to the delivery agent immediately.
● Immediately report any apparent defects/missing components to your contact partner.
These Operating Instructions are part of the scope of delivery; keep them in a location where
they can be easily accessed.
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
down in EN 50110‑1 regarding safe operation of electrical equipment.
Fragile material
Keep dry
Keep cool
Preparations for use
4.13 Transport and storage
Center of
Do not use
gravity
hand hook
Attach here
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1nb1402-2aa84-4ca0-z

Table of Contents