Siemens SIMOTICS HV C Operating And Installation Instructions page 7

Induction motor
Table of Contents

Advertisement

6.3.3
Cable ends with wire end sleeves..........................................................................................62
6.3.4
Connecting aluminum conductors..........................................................................................63
6.3.5
Internal equipotential bonding................................................................................................63
6.3.6
Stepless mating face for sealing in the terminal box cover....................................................63
6.3.7
Finishing connection work......................................................................................................64
6.4
Connecting the auxiliary circuits.............................................................................................64
6.4.1
Selecting cables.....................................................................................................................64
6.4.2
Selecting cables.....................................................................................................................65
6.4.3
Bringing cables into the auxiliary terminal box and routing them...........................................65
6.4.4
Degree of protection of the auxiliary terminal box..................................................................66
6.4.5
Connecting temperature monitoring for the stator winding....................................................66
6.4.6
Intrinsically safe circuits for sensors or probes......................................................................66
6.4.7
Installing intrinsically safe circuits..........................................................................................67
6.4.8
Internal equipotential bonding in the auxiliary terminal box...................................................68
6.4.9
Terminating the connection work (auxiliary circuit)................................................................68
7
Commissioning...........................................................................................................................................69
7.1
Prior to commissioning ..........................................................................................................69
7.2
Insulation resistance and polarization index..........................................................................71
7.3
Greasing the roller bearings prior to commissioning..............................................................71
7.4
Test run..................................................................................................................................72
7.5
Overvoltages when switching high-voltage motors................................................................73
8
Operation....................................................................................................................................................75
8.1
Safety instructions for operation.............................................................................................75
8.2
Switching on with the anti-condensation heating active.........................................................77
8.3
Switching on the machine......................................................................................................77
8.4
Regreasing roller bearings.....................................................................................................77
8.5
Switching on again after an emergency switching-off............................................................78
8.6
Stoppages..............................................................................................................................78
8.6.1
8.6.2
Avoidance of damage to roller bearings during stoppages....................................................79
8.6.3
Measuring the insulation resistance after an extended stoppage..........................................79
8.7
Decommissioning the machine..............................................................................................80
8.8
Re-commissioning the machine.............................................................................................80
8.9
Faults.....................................................................................................................................80
8.9.1
Inspections in the event of faults............................................................................................80
8.9.2
Electrical faults.......................................................................................................................81
8.9.3
Mechanical faults...................................................................................................................82
8.9.4
Roller bearing faults...............................................................................................................82
9
Maintenance...............................................................................................................................................85
9.1
Safety instructions for maintenance.......................................................................................85
9.2
9.3
Inspection and maintenance..................................................................................................86
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
Table of contents
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1nb1402-2aa84-4ca0-z

Table of Contents