Hirschmann RS20 series User Manual page 54

Industrial ethernet rail switch
Hide thumbs Also See for RS20 series:
Table of Contents

Advertisement

RPS90/48V HV: connecting the input voltage
With the RPS90/48V HV high-voltage PoE power unit, you connect either
a DC or AC supply voltage at the input connection:
60 V DC to 250 V DC
110 V AC to 230 V AC
The supply voltage is connected via pin 2 and pin 3, and the protective
conductor is connected via pin 1.
Figure
Pin
1
1
2
2
G
3
3
Table 13: Connecting the high-voltage supply voltage at PoE power unit
RPS90/48V HV (AC voltage)
Figure
Pin
1
1
2
2
3
3
Table 14: Connecting the high-voltage supply voltage at PoE power unit
RPS90/48V HV (DC voltage)
 First connect the protective conductor to the protective conductor
terminal.
 Connect the supply voltage via the 3-pin terminal block. Pay attention
to the +/L and -/N connections.
 If the neutral conductor or the minus terminal of the supply voltage is
not grounded, install a suitable fuse in the input line.
 For supply voltages > 125 V DC:
Install a suitable external fuse in the supply voltage input line of the
plus terminal.
 Use a supply cable with a maximum length of 2 meters to the power
unit.
54
Assignment
Protective conductor
Minus terminal of the supply voltage
Plus terminal of the supply voltage
Assignment
Protective conductor
Minus terminal of the supply voltage
Plus terminal of the supply voltage
= external fuse for supply voltages > 125 V DC
Supply voltage range
High voltage input voltage:
110 V AC to 230 V AC
Supply voltage range
High-voltage input voltage: 60
V DC to 250 V DC
Installation RS20/22/30/32/40
Release 05 12/2015

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs22 seriesRs30 seriesRs32 seriesRs40 series

Table of Contents