Checking The Package Contents; Installing And Grounding The Device; Installing The Device Onto The Din Rail - Hirschmann RS20 series User Manual

Industrial ethernet rail switch
Hide thumbs Also See for RS20 series:
Table of Contents

Advertisement

2.1

Checking the package contents

Proceed as follows:
 Check whether the package includes all items named in the section
"Scope of delivery" on page
 Check the individual parts for transport damage.
2.2

Installing and grounding the device

FIRE HAZARD
Install the device in a fire enclosure according to EN 60950-1.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Only when using the PoE power supply unit RPS90/48V HV:
ELECTRIC SHOCK
Install this device solely in a switch cabinet or in an operating site with
restricted access, to which maintenance staff have exclusive access.
Install the device at ambient temperatures greater than 113 °F (45 °C) in
"restricted access locations" based on EN 60950-1 exclusively.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
2.2.1

Installing the device onto the DIN rail

Verify that the device maintains the minimum clearing in order to meet the
climatic conditions:
Top and bottom device side: 3.94 in (10 cm)
Left and right device side: 0.79 in (2 cm)
46
74.
WARNING
WARNING
Installation RS20/22/30/32/40
Release 05 12/2015

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs22 seriesRs30 seriesRs32 seriesRs40 series

Table of Contents