Installation - Screen Innovations Solo Installation Instructions Manual

Lithium rechargeable rts
Table of Contents

Advertisement

INSTALLATION

Proper mounting preparation will ensure a great
installation. Mounting brackets must be level to each
other, and screwed into structural members of some
kind, such as wall studs. You may use wood screws
provided, or other anchors (not provided) capable of
carrying the load, that is suitable to the substrate.
DO NOT MOUNT TO ONLY SHEET ROCK.
Install the Quick Release Brackets
1. Determine the top of the desired viewing area on
the wall.
2. The mounting brackets should be located 1 " + Drop
+ the desired top of viewing height. The factory set
drop is 1", but may be programmed to be up to 12".
3
Ex: 10" Drop + 1 " + 82" viewing area above floor =
8
3
93 " bracket screw height.
8
NOTE : Maximum drop for Short Throw material is 4".
Installation
3
8
3
Case Length
Factory drop is 1"
Max. drop is 12"
NOTE: Max. drop for
Short Throw is 4".
Installation
View
Height
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo pro

Table of Contents