System Setup; Unpack The Subrack - Codan Cascade Operation Manual

Table of Contents

Advertisement

U N PA C K TH E SU B R AC K
The CASCADE subrack ships from the factory with the modules installed, based on specific customer
configurations. Unpacking procedures require two people (skilled in material handling procedures) to
unpack and move the filled subrack.
The modules and full CASCADE subrack
are very heavy. Use extreme caution
when moving or lifting. Comply with all
material handling regulations.

SYSTEM SETUP

Cascade System Modules Operation Guide
OG-CASC-SYS-MOD-1-0-0P
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cascade and is the answer not in the manual?

Table of Contents