2.1 Power Up Procedure
When the analyzer is powered on, it displays the Nova Prime
CCS logo. During this time, an internal Power On Self Test
(POST) is run. Any errors encountered during the POST
will display on the analyzer's screen.
After successfully completing the POST, the Home screen
displays with Initializing. During initialization, an internal
diagnostic sequence is run: the Sensor Card life; the calibrator
cartridge fluid level; and the internal QC cartridge fluid level
are checked.
The Prime CCS performs a prime cycle. After completion,
the screen displays
Figure 2.3
Initializing
Not
Ready.
Figure 2.4
Not Ready
2 Getting Started
Screen
Screen
2-3