Installation And Use; Requirements - NOVA BIOMEDICAL Stat Profile PRIME Instructions For Use Manual

Ccs analyzer
Table of Contents

Advertisement

Prime CCS Instructions for Use Manual
Chemical and Biological Safety
1. Observe all precautionary information printed on
the original solution containers.
2. Operate the analyzer in the appropriate environment.
3. Take all necessary precautions when using
pathologic or toxic materials to prevent the
generation of aerosols.
4. Wear appropriate laboratory attire, e.g., safety
glasses, gloves, lab coat, and breathing apparatus,
when working with hazardous materials.
5. Dispose of all waste solutions according to standard
hospital procedures.

1.3 Installation and Use

This section covers the installation requirements and
assembly procedures for the Stat Profile Prime CCS Analyzer.
Prior to use of the analyzer, operators should be familiar with
Chapter 2 Operation and Chapter 3 Operating Procedures.
NOTE:
Under the Warranty, a Nova service representative
will install this equipment for you.

1.4 Requirements

Working Area Requirements (Environmental):
Keep the working area around the system free of dirt,
corrosive fumes, vibration, and excessive temperature
changes.
Electrical Requirements:
Operating Voltage Range:
Operating Frequency:
Power Consumption:
Ambient Operating Temperature:
15°C to 30°C (59°F to 86°F)
Operate at Humidity:
20 to 85% without condensation
1-4
90 - 270 VAC
47 - 63 Hz
Less than 100 Watts

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents