30
266CRH / 266CRT, 266CSH / 266CST MULTIVARIABLE PRESSURE TRANSMITTER | OI/266CXX/MODBUS-EN REV. A
... 6 Installation
... Mounting recommendations
Fill level measurement on the steam boiler
(drum water level)
H High pressure side
L Low pressure side
1 Gas
Figure 22: Level measurement on the steam boiler
Mount the transmitter at the same height or below the
lowest level to be measured.
Connect the high pressure side '+' of the transmitter to the
bottom of the tank.
The low pressure side '–' of the transmitter up at the tank.
Above the maximum level, connect using a condensate
vessel.
Use the condensate vessel to ensure that the impulse line of
the low pressure side is always filled with liquid (condensate)
at a constant height.
2 Liquid
3 Condensate vessel

Temperature measurement

Mount the temperature sensor in the downstream pipe of
the primary element.
Consider the downstream straight pipe requirements.
If there is a significant difference between the temperature
of the measuring medium and the ambient temperature, the
measuring error caused by heat conduction must be
minimized by insulating the installation location accordingly.
Use class 'A' sensors to maximize accuracy.
The lengths of the protective tubes should be 15 to 20 times
the diameter of the protective tube for gas measurements
and 3 to 5 times the diameter of the protective tube for
liquid measurements.