Preparations For Communications; Procedures Prior To Starting Communications - Omron CS1W-PRM21 Operation Manual

Sysmac cs/cs series
Hide thumbs Also See for CS1W-PRM21:
Table of Contents

Advertisement

Basic Operating Procedure
1-5-2

Preparations for Communications

1,2,3...
1-5-3

Procedures Prior to Starting Communications

1,2,3...
1. Mount the Master Unit on the PLC system (refer to 2-2 Installing the
PROFIBUS-DP Master Unit ).
• Treat the Unit as a CPU Bus Unit.
• It can be mounted to a CPU Rack or Expansion Rack.
• Number of Units: 16 (Max).
2. Set the Unit No. (UNIT No.) for the PROFIBUS-DP Master Unit (refer to 2-
3-1 Selecting a unit number ).
3. Connect a PC or a Programming Device to the PLC and turn ON the power
supply to the PLC.
4. Generate the I/O tables and restart the PLC (refer to 2-3-2 Creating an I/O
table ).
5. Install CX-Profibus, and the DTMs on to the PC.
Use the following procedure to configure the Unit using CX-Profibus:
1. Wire the network, to connect the PROFIBUS-DP Master unit to the slave
stations.
2. Turn ON the PLC power supply and the power supplies of the Slave station
on the network.
3. In CX-Profibus, create a network and define the parameters and I/O con-
figurations for the PROFIBUS-DP Master Unit settings and the allocated
Slave stations. Determine the baud rate and the bus parameter setup.
Make sure that the "Go to OPERATE mode" option is selected, to force the
Unit to OPERATE mode upon a PLC mode change to RUN / MONITOR
mode.
4. Download the network configuration to the PROFIBUS-DP Master Unit. Af-
ter downloading the configuration, CX-Profibus will restart the PROFIBUS-
DP Master Unit.
5. After restarting the PROFIBUS-DP Master Unit it will automatically start
communication.
Section 1-5
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cj1w-prm21

Table of Contents