Mounting The Option Box; Precautions When Mounting The Option Box; To Install The Option Box; Connecting The Water Piping - Daikin EBLQ011CA3V3 Installer's Reference Manual

Hide thumbs Also See for EBLQ011CA3V3:
Table of Contents

Advertisement

7 Installation
7.5

Mounting the option box

7.5.1
Precautions when mounting the option
box
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
7.5.2

To install the option box

1 Remove the front plate.
2 Hold the back plate against the wall and mark the fixation points
(2 on the top and 2 at the bottom).
NOTICE
Make sure that the marks (2 by 2) are completely level and
that their dimensions correspond to the figure below.
318 mm
3 Drill 4 holes and install 4 plugs (suitable for M5).
4 Put the screws in the top plugs and hang the box on the
screws.
5 Put the screws in the bottom plugs.
6 Fix the 4 screws firmly.
7.6

Connecting the water piping

7.6.1

About connecting the water piping

Before connecting the water piping
Make sure the outdoor unit is mounted. If applicable, also make sure
the control box and the backup heater are mounted.
Typical workflow
Connecting the water piping typically consists of the following
stages:
1
Connecting the water piping of the outdoor unit.
2
Connecting the water piping of the backup heater and/or the
domestic hot water tank (if applicable).
3
Filling the water circuit.
4
Protecting the water circuit against freezing (addition of glycol).
5
Filling the domestic hot water tank (if applicable).
6
Insulating the water piping.
Installer reference guide
32
7.6.2
Precautions when connecting the water
piping
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
7.6.3

To connect the water piping

NOTICE
Do NOT use excessive force when connecting the piping.
Deformation of the piping can cause malfunctioning of the
unit. Make sure that the tightening torque does NOT
exceed 30 N•m.
To facilitate service and maintenance, 2 shut-off valves are provided.
Mount the valves on the space heating water inlet and space heating
water outlet. Mind their position: the integrated drain valves will only
drain the side of the circuit on which they are located. To be able to
only drain the unit, make sure the drain valves are positioned
between the shut‑off valves and the unit.
a
b
a
Water inlet
b
Water outlet
1 Screw the outdoor unit nuts on the shut-off valves.
2 Connect the field piping on the shut-off valves.
3 In case of connection with the optional domestic hot water tank,
see the installation manual of the domestic hot water tank.
NOTICE
Install a manometer in the system.
NOTICE
Install air purge valves at all local high points.
NOTICE
In case an optional domestic hot water tank is installed: A
pressure relief valve (field supply) with an opening
pressure of maximum 10 bar must be installed on the
domestic cold water inlet connection in accordance with
the applicable legislation.
EBLQ+EDLQ011~016CA3V3+W1 + EK(2)CB07CAV3
Daikin Altherma low temperature monobloc
4P538847-1 – 2018.05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents