Radian RD-30 Operation Manual page 56

Portable three-phase electricity standard
Table of Contents

Advertisement

Application Information
Step 10
Using the stylus, select the Save Button and navigate to the View Results Tab. Select the View
Results Button and enter the date of the test. Select the View Button to view the results.
Sensor Meter Testing Using the RR-DS, RR-1H, or RR-KYZ Sensors
Step 1
Make all appropriate connections (see Figures 10.2, 10.3, 10.4) so the DUT and RD-30 are
powered by the same source. If using the new RR 4-pin Lemo type sensors, connect the sensor
to the RD-30 Pickup port being careful to align the reds dots on both the sensor and Pickup port.
If using the older RM BNC type sensors, connect the sensor to the appropriate Input Port (see
Section 4.7).
Figure 10.2 Testing a 3-Phase Induction Meter with a RR-DS/f Meter
Sensor with Field Mount
56
RD-30 Operations Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents