Radian RD-30 Operation Manual page 43

Portable three-phase electricity standard
Table of Contents

Advertisement

Operating System and Structure
A single tap on the Run tab opens the following window.
In the Run tab the user verifies the Meter S/N and the Function to be tested before the test is
started. To begin the test, the user selects the DUT and then taps the Run button.
At the conclusion of the test, the Run window is filled in with data as in the following window.
The Percent Registration, Percent Error, Test Status, Metric Value, Function Tested, Minimum Per-
cent Registration, Minimum Percent Error, Minimum Percent Pulses, Minimum Percent Metric,
Standard Deviation of Percent Registration, Standard Deviation of Percent Error, Standard Devia-
tion of Number Pulses and Standard Deviation of the Metrics being tested are reported.
43
RD-30 Operations Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents