APV
APV_PR2_UK-4_082017.qxp
5
8.
Maintenance
- The maintenance intervals are different depending on the
application and are to be determined by the operator himself
carrying out temporary checks.
- Complete seal kits for the valve service are available
(see spare parts lists).
- Exchange of seals according to Service Instructions.
- Provide all seals with a thin layer of grease before their installation.
Recommendation:
APV assembly grease for EPDM, HNBR and FPM
(750 g /tin
(60 g /tube
or
APV assembly grease for VMQ
(600 g /tin
(60 g /tube
! Do not use grease containing mineral oil for EPDM seals !
! Do not use Silicone-based grease for VMQ seals !
- Assembly of the valve according to Service Instructions.
- ref.-No. 000 70-01-019/93; H147382)
- ref.-No. 000 70-01-018/93; H147381)
- ref.-No. 000 70-01-017/93; H147380)
- ref.-No. 000 70-01-016/93; H147379).
UK
Sampling valve
DELTA PR2
Instruction manual: UK - rev. 4
Need help?
Do you have a question about the APV DELTA PR2 and is the answer not in the manual?
Questions and answers