YASKAWA AO-A3 User & Installation Manual page 28

Ac drive option analog monitor
Hide thumbs Also See for AO-A3:
Table of Contents

Advertisement

5 Installation Procedure
u
Option Connection Diagram
Refer to
Table 5
on page
To ensure accurate control, use stable power supply for the voltage reference source.
<1> Connect the provided ground wire during installation on 1000-series drives. Installation on GA700, CR700, and
CH700 drives does not require the ground wire.
NOTICE: Do not adjust the potentiometers on the option. The potentiometers are factory set and may
change the voltage output characteristics and cause output signal inaccuracy if misadjusted.
u
Wire Gauges, Tightening Torques and Ferrule-Type Terminals
Wire Gauges and Tightening Torques
n
Wire gauge and torque specifications are listed in
Tightening
Terminal
Screw
signal
Size
Nm (inlb)
V1, V2,
0.22 to 0.25
M2
AC, FE
(1.95 to 2.21)
28
29
for a detailed description of the option board terminal functions.
Drive
R/L1
S/L2
CN5
T/L3
FE
<1>
Twisted-pair shielded line
Main circuit terminal
Figure 17 Option Connection Diagram
Table 3 Wire Gauges and Tightening Torques
Bare Cable
Torque
Recomm.
Gauge mm
0.75
(18 AWG)
YASKAWA ELECTRIC TOBP C730600 79C YASKAWA AC Drive Option AO-A3 Installation Manual
TB1
AO-A3
FE
Control circuit terminal
Table
3.
Applicable
2
Gauges mm
2
Gauge mm
Stranded wire:
0.25 to 1.0
(24 to 17 AWG)
Solid wire:
0.25 to 1.5
(24 to 16 AWG)
Monitor
V1
AC
V2
AC
<1>
AO
Ferrule-Type Terminals
Recomm.
Applicable
2
Gauges mm
0.5
0.25 to 0.5
(20 AWG)
(24 to 20 AWG)
FM
AM
Wire
Type
2
Shielded
twisted
pair, etc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Do-a3

Table of Contents