How to Install an Optional Expansion Module

Figure 19: Installing an Optional Module

1
2
1
Module Slot
4.
Holding the module level, guide it into the carrier rails on each side and gently
push it all the way into the slot, ensuring that it firmly engages with the
connector.
5.
If you are sure the module is properly mated with the connector, tighten the
captive screws to secure the module in the slot.
6.
The Module LED on the switch's front panel should turn green to confirm that
the module is correctly installed and ready to use.
2
– 31 –
Expansion Module