48 GE Port with 4*10G SFP+ with 2 Expansion Slots Data Center Switch
AS4600-54T
1. Unpack the Switch and Check Contents
Rack Mounting Kit—Contains two brackets and eight
screws for attaching the brackets to the switch.
Grounding Wire
Power Cord—either Japan, US, Continental Europe
or UK
Console Cable—RJ-45 to DB-9
Documentation—Quick Start Guide (this document)
and Safety and Regulatory Information
Note:
For information on switch software, refer to
www.edge-core.com.
Switches with part numbers 4600-54T-D*-******** have
switch software pre-loaded on the switch. Software user
documentation can be found at www.edge-core.com.
Switches with part numbers 4600-54T-O-******** have the
Open Network Installer Environment software installer pre-
loaded on the switch, but no switch software image.
Information about compatible switch software can be
found at www.edge-core.com.
Caution:
The switch includes plug-in power supply and
fan tray modules that are installed into its chassis. All
installed modules must have a matching airflow direction.
That is, all modules must have a front-to-back (F2B) airflow
direction, or all modules must have a back-to-front (B2F)
airflow direction. The airflow direction of PSU and fan tray
modules is indicated by labels on the modules.
2. Mount the Switch
2
1
Attach the brackets to the switch.
2
Use the screws supplied with the rack to secure the switch in
the rack.
Caution:
Installing the switch in a rack requires two
people. One person should position the switch in the rack,
while the other secures it using the rack screws.
www.edge-core.com
AS4600-54T Data
Center Switch
1
– 1 –
3. Ground the Switch
2
1
1
Ensure the rack on which the switch is to be mounted is
properly grounded and in compliance with ETSI ETS 300 253.
Verify that there is a good electrical connection to the
grounding point on the rack (no paint or isolating surface
treatment).
2
Attach a grounding wire to the grounding point on the
switch rear panel, then to rack ground.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
4. Connect Power
1
2
1
Install one or two universal AC power modules in the switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan tray.
2
Connect an external AC power source to the modules.
5. Verify Switch Operation
1
Verify basic switch operation by checking the system LEDs.
When operating normally, the Pwr1/Pwr2, Diag, and Fan1/
Fan2 LEDs should all be on green. (If only one PSU is
installed, the Pwr 2 LED will be off.)
1
E022014-CS-R02
150200000854A

Advertisement

loading

Summary of Contents for Edge-Core AS4600-54T

  • Page 1 Switches with part numbers 4600-54T-D*-******** have switch software pre-loaded on the switch. Software user documentation can be found at www.edge-core.com. 4. Connect Power Switches with part numbers 4600-54T-O-******** have the Open Network Installer Environment software installer pre- loaded on the switch, but no switch software image.
  • Page 2: Hardware Specifications

    Quick Start Guide 6. Perform Initial Configuration Hardware Specifications Chassis Specifications SIze W x D x H: 440 x 280 x 44 mm (17.32 x 11.02 x 1.73 inches) Weight 8.5 kg (18.74 lb), with two installed power supply modules (no 40G modules) Temperature Operating: 0°...