Airstream LAND YACHT 1989 Owner's Manual page 88

Hide thumbs Also See for LAND YACHT 1989:
Table of Contents

Advertisement

1.
Place the mounting plate
(Item
#16)
on the gear case cover fthe
quare holes in the mounting plate should be away from the motor)
and install and tighten the four
(
4
)
l
1
/
4
" ionp-
#1
a
t
screws (Item #13).
'
on®
se ^ taPPing
8'
lnstnallthtehemr,r assembly, lover and set it on the flat mounting plate.
Install the linkage assembly (Item #
8
, #
9
, or #10) into the gear case
Be sure the linkage assembly seats all the way into the
gear
and
bearing
or
the bearing bracket
(Item #2) will
not set oroDerlv
The
™VlytaU
and
^uld
face
the^ront4 7^'^
9-
°n
the ltaka*e assa"My
««. the
,0-
-^^tr«rsembly and instai1
L
moim?11 Kthi!
m°t0r
assembly
on
the
Step
frame
and
tighten
all
same wfv theSoldN°te:
Be SUre the m°t0r assembly is Positioned the
same way the old one was prior to removal.
2'
steTframe
#P.throuSh the d™a arms attached to the
#
10
^
R '
d
4th6
Cast b ock in the linkage assembly (Item #
8
,
#9
or
removed
?™re,?th"T*aU
ClevlS pi" ln the same direction it was
removed.
Install the hair pin (Item #
6
) in the clevis pin.
rhpg
ra°tded motor plug into the motor assembly and connect
the control unit to the coach (four way square plug)
4.
Test step functions.
5'
S
0
pLh%aovder
33
BS r inreSiehPS'teXtend
St6P a"d ^"Stall
P^lic
in
the rear of the
V
°Ur Way Square
plu8
is fed out the notch
in the rear of the plastic cover.
Tighten all mounting nuts.
C-54

Advertisement

Table of Contents
loading

Table of Contents