Vertical "Yoke Out" Hang - PRG BAD BOY 02.9812.0001C User Manual

Spot luminaire
Table of Contents

Advertisement

B
B
™ S
L
AD
OY
POT
UMINAIRE

Vertical "Yoke Out" Hang

The Bad Boy™ Spot Luminaire can be hung in a vertical position, if required. In this configuration,
the luminaire should be positioned so that the interface panel (display) is facing downward for ease of
programming.
WARNING: The luminaire is heavy. Use caution when lifting.
WARNING: The vertical configuration requires 3 people to hang and secure the luminaire.
WARNING: Two safety cables and at least two truss hooks should be used in all hang configurations.
To install in vertical hang:
Step 1. Orient Hanging Brackets as shown in
Figure
Step 2. Place Hanging Bracket down over
buttons and slide until bracket locks
into place (you will hear a "click"
when bracket is locked).
CAUTION: Hanging Brackets must be
installed in the orientation shown in
so that the interface panel (display) will face
downward.
Step 3. Roll case to mounting location as
required
Step 4. Using two people, carefully lift
luminaire into mounting position so
that display is facing downward.
Step 5. Using a third person, secure in place
by tightening Truss Hook wing bolts.
Ensure that luminaire is fully supported.
Step 6. Feed safety cables through mounting bracket slots and secure around pipe.
Step 7. Connect power and data cables according to
1 6
U
M
SER
ANUAL
2-6.
Figure 2-6
(Figure
2-7).
Figure 2-6: Attaching Hanging Brackets
"Connecting Power and Data"
on page 19.
02.9812.0001C

Advertisement

Table of Contents
loading

Related Products for PRG BAD BOY 02.9812.0001C

This manual is also suitable for:

Bad boy20.9812.0001

Table of Contents

Save Article as PDF