Installation Of The Boiler Module Rxvbc605; Receiver - Salus iT500BM Installer Manual

Table of Contents

Advertisement

2. Installation of the boiler module RXVBC605

RXVBC605 RECEIVER
1. Switch off the boiler at its main supply.
2. Remove cover panel or existing control.
3. Insert the integral boiler control ensuring correct location
of the rear connection pins.
04 iT500BM Installer Manual
For ECOTEC post April 2012 -
remove and discard pins.
For ECOTEC models prior to
April 2012, use as supplied.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents