Salus iT500BM Installer Manual page 8

Table of Contents

Advertisement

2. Installation of the boiler module RXWBC605
RXWBC605 RECEIVER
A
Now locate the boiler control' s four hooks then
press in and down. Replace cover panel A.
Replace the front fascia and boiler' s outer casing.
Before switching the boiler on at its mains supply,
ensure the module switch is in the OFF position
.
08 iT500BM Installer Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents