If necessary, fit an earth bonding
9
clamp to the supply pipe. Make
sure the bonding complies with the
relevant regulations in force at the
time of installation.
Turn on the water supply and check
10
for any leaks.
Refit the service tunnel and the
11
required insert. If necessary, cut out
the slot marked. (Only required if the
inlet water pipe is entering the right
hand side of the shower.)
Replace the cover making sure it
12
fits properly to the case. Do not trap
any wires.
Fit the three retaining screws.
13
Install the shower fittings, refer to
14
your Shower Fittings Installation
and User Guide.
Retaining Screws
Retaining
Screw
15
Service
Tunnel