Installation - Mira Jump 96Va Installation And User Manual

8.5, 9.5, & 10.8 kw
Table of Contents

Advertisement

Replacing an Existing Shower
40 mm
150 mm
Check the existing installation is positioned according to the dimensions specified in
the diagram above. The Mira Jump shower can replace showers of the approximate
shape and size of those shown.
Electrical - Terminal Block locations are provided on both the left and right for
convenience when replacing a shower. Note! By default the electrical supply position
is set for left hand entry, if the installation favours right hand entry some adjustment
of the terminal block in the case will be required. Go to "Adjustment for right hand
electrical supplies"

INSTALLATION

170 mm
309 mm
Inlet Water
Supply
212 mm
50 mm
Left Side
(Default)
45 mm
Terminal Block
150 mm
Fig 1.1
Right Side
10
170 mm
300 mm
Inlet Water
Supply
220 mm
55 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jump 96waJump 96xa

Table of Contents