Programming; Display - Pentair FLECK 5800 SXT Installer Manual

Hide thumbs Also See for FLECK 5800 SXT:
Table of Contents

Advertisement

Installer Manual Fleck 5800 - SXT - Programming
6.

Programming

6.1.

Display

1. Parameter display
Regeneration cycles:
46 / 92
→ C: Unit capacity;
→ CD: Current day;
→ Cn, n=1 to 20: Cycle number;
→ CR: Variable reserve capacity;
→ CT: Regeneration control type;
→ DF: Display format;
→ Dn, n=1 to 7: Day of week;
→ DO: Days override;
→ ET: Relay end time;
→ FM: Flow meter;
→ FR: Current flow rate;
→ H: Feedwater hardness;
→ HR: Hours in service;
→ K: Meter pulse;
→ PF: Peak flow rate;
→ RC: Fixed reserve capacity;
→ RE: Relay setting;
→ RF: Regeneration flow;
→ RS: Reserve selection;
→ RT: Regeneration time;
→ SF: Safety factor;
→ ST: Relay start time;
→ SV: Software version;
→ TD: Time of day;
→ TO: Relay time on;
→ TV: Totalizer;
→ V: Filter capacity;
→ VO: Volume interval;
→ VU: Volume used;
→ VT: Valve type.
→ B1: First backwash (for dF2b regeneration mode);
→ B2: Second backwash (for dF2b regeneration mode);
→ BD: Brine draw;
→ BF: Brine fill;
→ BW: Backwash;
→ RF: Refill;
→ RR: Rapid rinse;
→ SP: Service position;
→ SR: Slow rinse.
Ref. MKT-IM-004 / A - 18.04.2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents