Flow Based Relay Setting (Vr) - Pentair FLECK 5800 SXT Installer Manual

Hide thumbs Also See for FLECK 5800 SXT:
Table of Contents

Advertisement

6.5.18.1 Relay start time (ST)
Set the relay start time.
Note
This option is available only if RE is set to tb.
Note
The relay start time can be set from 0 minute to the total of time of all the cycles minus 1
minute.
AX Press
or
AY Press
to validate the selection and move to the next parameter.
6.5.18.2 Relay end time (ET)
Set the relay end time.
Note
This option is available only if RE is set to tb.
Note
The relay end time can be set from start time to the total of time of all the cycles.
AZ Press
or
BA Press
to validate the selection and move to the next parameter.

6.5.19. Flow based relay setting (VR)

Select the relay setting.
Note
The relay can bet set upon a time base (tb) or a flow base (Fb). Only one method can be used
at a time.
Note
This option is available only if RE is set to OFF.
Note
If set to Fb, the controller will enable and disabled the relay output every time the set volume
interval is reached for the set time ON.
BB Press
or
BC Press
to validate the selection and move to the next parameter.
Ref. MKT-IM-004 / A - 18.04.2017
to set the relay start time.
to set the relay end time.
to select between Fb and OFF.
Installer Manual Fleck 5800 - SXT - Programming
59 / 92

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents