Graco ProMix 2KS Operation Manuals page 80

Plural component proportioner
Hide thumbs Also See for ProMix 2KS:
Table of Contents

Advertisement

Color/Catalyst/(Reducer)
Purge from 0, No Fill -->
Stack Valves
Solvent A
Dump A
Component A
Solvent B
Dump B
Component B
Separate Gun 1 and Gun 2
Purge from 0 -->
Purge Valves
Exiting Fill Selection
First Purge Selection
Purge A (Air)
Purge B (Solvent)
3rd Purge Valve on A
2 s B Purge after Chop
Final Purge Selection
Separate Gun 1 and Gun 2
No Fill -->
Dose Valves
Dose A
Dose B
GFB Outputs
If No Gun Flush Boxes
Gun Trigger(s) by Operator
1 Gun
Gun Flush Box Output 1
Gun Flush Box Output 2
2 Guns
Gun Flush Box Output 1
Gun Flush Box Output 2
Digital I/O
Color Change Input
Purge Active Output
Fill Active Output
Mix Ready Output
Special Outputs
Special Output #1
Special Output #2
Special Output #3
Special Output #4
3 + GFB on #4
F
. 79: ProMix 2KS Recipe Purge Chart #9 0 to 0
IG
ProMix 2KS Recipe Purge Chart #9 0 to 0
Dump A Enabled, 3rd Flush Valve Enabled
Waiting
A Purge
Color Change Stack Flush Sequence
Dose Valve and Integrator Flush Purge and Chop Operations by Time - From Recipe 0
Exit. Fill
First Purge
Total Chop
Dose Valve and Integrator Flush Sequence
From Recipe 0
Gun and Hose Flush Operations by Time
This happens on the same time scale as the Dose Valve and Integrator Flush Sequence
Each Integrator Flush Purge, Chop, and Mix Material Fill operation runs sequentially for Gun 1 then for Gun 2
<- Start of Color Change
<- Start of On-Purge
<- Length ->
<- Length ->
<- Length ->
Stack Valves Off
Exiting Fill Enabled
Color Change Stack Purge and Fill Operations by Time - From Recipe 0
B Purge
Waiting
Every recipe 0 entry will flush all components
Flush out old color
Flush out old catalyst
2 s B
Final Purge
Recipe 0: Purge A (Air), Purge B (Solvent), or 3rd Valve on A
Select Purge A (Air), Purge B (Solvent), or 3rd Valve on A
Fixed for Purge A (Air)
If Chop Type is "Air/Solvent"
If Chop Type is "Air/3rd Purge"
Fixed Purge B. Enabled in Options Screen 2
Select Purge A (Air), Purge B (Solvent), or 3rd Valve on A
Dose Valve and Integrator Mix Fill Operations by Time
Discrete I/O Signals by Time
End of Color Change ->
<- Length ->
Color Change Stack Components
Purge Operation Details
Mixed Fill Time using Sequential Dosing
Mixed Fill Time using Dynamic Dosing
Gun and Hose Mix Material Fill Operations by Time
2KS 0 to 0 K3