Graco ProMix 2KS Operation Manuals page 37

Plural component proportioner
Hide thumbs Also See for ProMix 2KS:
Table of Contents

Advertisement

NOTE: Each screen displays the current screen number
and the total number of screens in the group. The total
number of screens in a group and the fields displayed
on each screen may vary depending on selections
made in the System Configuration Screens and
Option Screens.
Advanced Setup Screen 1
F
. 33. Advanced Setup Screen 1
IG
Gun 1/Gun2 Potlife Volume
Enter the potlife volume (1 to 1999 cc) for each gun.
This is the amount of material required to move through
the mix manifold, hose and applicator/gun before the
potlife timer is reset.
Use the following information to determine approximate
pot life volume (PLV) in cc:
Hose ID (inches)
Volume (cc/foot)*
3/16
1/4
3/8
Integrator manifold and mixer volume = 75 cc
Spray Gun Volume = 20 cc
(Hose Volume* x Feet of Hose) + 75 + 20 = PLV
Color/Catalyst Purge
This field only appears if the system includes a color
change module and Flush and Fill Input is set to
"Global" in Option Screen 1, page 34. Enter the purge
time (0 to 99 seconds). It refers to the amount of time
required to flush the lines from the color or catalyst mod-
ule to the dose valve or dump valve.
312776K
5.43
9.648
21.71
Color/Catalyst Fill
This field only appears if the system includes a color
change module and Flush and Fill Input is set to
"Global" in Option Screen 1, page 34. Enter the fill time
(0 to 99 seconds). It refers to the time required to fill the
lines from the color or catalyst module to the dose valve
or dump valve.
Advanced Setup Screen 2
F
. 34. Advanced Setup Screen 2
IG
This screen appears only if Flush and Fill Input is set to
"Global" in Option Screen 1, page 34.
First Purge Source
Select "Air," "Solvent," or "3rd Flush Valve" (available
only if 3rd Flush Valve is set to "On" in Configure
Screen 3 on page 32).
Chop Type
Select "Air/Solvent" or "Air/3rd Flush Valve" (available
only if 3rd Flush Valve is set to "On" in Configure
Screen 3 on page 32). This refers to the process of mix-
ing air and solvent (or air and 3rd flush fluid) together
during the flush cycle, to help clean the lines and reduce
solvent usage.
Final Purge Source
Select "Air," "Solvent," or "3rd Flush Valve" (available
only if 3rd Flush Valve is set to "On" in Configure
Screen 3 on page 32).
Air Chop Time
Enter the air chop time (0.0 to 99.9 seconds).
Solvent Chop Time/3rd Flush Valve Chop Time
Enter the solvent or 3rd flush valve chop time (0.0 to
99.9 seconds).
Setup Mode
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Promix 3ks

Table of Contents