Baseplate-Mounting Procedures; Prepare The Baseplate For Mounting - Goulds Pumps 3700 Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Installation
• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow
Sleeve-type bolts
1. Baseplate
2. Shims or wedges
3. Foundation
4. Sleeve
5. Dam
6. Bolt
J-type bolts
1. Baseplate
2. Shims or wedges
3. Foundation
4. Dam
5. Bolt

Baseplate-mounting procedures

Prepare the baseplate for mounting

This procedure assumes you have a basic knowledge of baseplate and foundation design and
installation methods. Follow industry-standard procedures, such as API RP 686/ PIP REIE 686,
or this procedure before you grout the baseplate.
1. Make sure that all baseplate surfaces that will contact grout are free from contamination
such as rust, oil, and grime.
2. Thoroughly clean all baseplate surfaces that will come in contact with grout.
Make sure to use a cleaner that will not leave residue.
NOTICE:
You may need to sandblast the surfaces of a baseplate that come in contact with grout, and
then coat those surfaces with a primer that is grout-compatible. Make sure to remove all
equipment before sandblasting.
20
Model 3700, API Type OH2 / ISO 13709 1st and 2nd Ed. / API 610 8/9/10/11th Ed. Installation, Operation, and Maintenance
movement for the final bolt adjustment.
Manual

Advertisement

Table of Contents
loading

Table of Contents