Onboard Interconnectivity; Onboard Connectors And Headers; Board Hot Swap And Installation; Installing An Amc - Kontron AM4500 User Manual

Am450 series
Table of Contents

Advertisement

3.2

Onboard Interconnectivity

3.2.1

Onboard Connectors and Headers

Description
AMC Connector
SATA Connector
3.3

Board Hot Swap and Installation

Some precautions must be taken when connecting or disconnecting a board to:
1 Rail guides must be installed on the enclosure to slide the board to the backplane.
2 Do not force the board if there is mechanical resistance while inserting the board.
3 Use extractor handle to disconnect and extract the board from its enclosure.
Always use a grounding wrist wrap before installing or removing the board from a
chassis.
3.3.1

Installing an AMC

To install an AMC:
1 Remove the AMC filler panel.
2 Carefully engage the AMC into the card guide. Push the AMC until it fully mate with it's connector. Secure
the AMC handle to the locking position.
3 In normal condition, the blue LED shall turn ON as soon as the AMC is fully inserted. It will turn OFF at the
end of the hot swap sequence.
3.3.2

Removing an AMC

To remove an AMC:
1 Open the AMC handle.
2 The blue LED will start blinking; wait until it is solid blue.
3 Extract the AMC by pulling it out with the handle.
Note:
Ensure that your OS is Hot Plug compliant before removing your AMC.
Connector
Comments
J4
AMC Connector
J5
Serial ATA Connector
WARNING
12
Installing the Board
AM450x User's Guide

Advertisement

Table of Contents
loading

Table of Contents